Päevalille 19
In creating the piled raft foundation of the DELTA Centre of the University of Tartu, we drove d620mm, d820mm, d1200mm bored piles and d51mm injected piles.
Very complicated geological cross-section and heavy structure of the building required more than 2km of bored piles, biggest loads per pile reached more than 900 tons.